Reset Operation of Loading Arm

Today, I will introduce the resetting operation of the Loading Arm.

1. The pipeline is drained and replaced with nitrogen to ensure that the unloading arm has been emptied.

2. Loosen the connecting claws.

3. Remove the flange connection bolts.

4. Replace the connector blind flange and tighten the connecting claws.

5. Retract the joint legs.

6. Unplug the truck crane and lock the check bolt on the handle.

 

For the introduction of the above Loading Arm, it is recommended that you master it well and study well, so that it will help in understanding and solving the problem.


If you need Upper Loading Arm, Pls tell me your email. We can send details to your email.

Upper Loading Arm

loganhailang