Loading and Metering Skid

The Loading and Metering Skid Manufacturer!

 

 

Lianyungang Hechang Machinery Co., Ltd everages the advantages of the Lianyungang petrochemical industry cluster and is dedicated to the field of fluid chemical handling equipment and petrochemical machinery. With 15 years of industry experience to date, the company is a professional enterprise integrating R&D, production, and sales, providing comprehensive services for fluid handling equipment, including consulting, design, manufacturing, inspection, installation guidance, and maintenance.

 

 
 
why choose us
 
 
 

Strong Technical Support

Our technical team is always on standby, providing fast and timely technical support to ensure the normal operation of the equipment.

 
 

Extensive Project Experience

We have accumulated rich experience in project implementation across Europe, Central Asia, Asia, Africa, and South America, enabling us to efficiently handle various challenges.

 
 

Production Equipment

The company is equipped with CNC automatic welding machines, CNC laser welding equipment, CNC lathes, CNC milling machines, CNC drilling machines, CNC cutting machines, and CNC shot blasting and rust removal machines, among others.

 
 

Our Services

We have established a dedicated customer service team to promptly respond to client feedback and resolve issues.

 

 

Main functions of Loading Arm Skid
 

Batch control: The LNG batch controller installed on the skid is activated upon receiving an order to begin loading. It follows a predetermined protocol that opens the valves and tracks the flow rate via a flowmeter. When the designated loading capacity is reached, the procedure is completed by closing the valves.

 

Pre-cool tank: In order to load LNG safely, tank cars arriving at the loading station must be pre-cooled. This is done by spraying with low flow rate at the top, reducing the temperature in the tank through LNG gasification. Once the temperature in the tank has been lowered to around -100 degrees, full flow bottom loading can begin.

 

Flow control: A flow control valve and mass flowmeter are installed on the loading skid to ensure the loading process is carried out smoothly and safely. The valve and meter work together to effectively regulate the flow rate.

 

Nitrogen purging: Nitrogen purging is enabled by three nitrogen regulating valves fitted on the loading skid. These valves are used for nitrogen purging of the loading arm both before and after loading, as well as creating a nitrogen seal on the rotary joint, and for detection of any potential leaks.

 

Temperature and pressure alarm: This control system is designed with pressure and temperature transmitters installed on the LNG and RG pipelines of the loading skid in order to monitor temperature and pressure during loading. If their values exceed the predetermined limit, an alarm will sound to alert the necessary personnel.

 

Safe release of pressure: In an emergency, safety valves installed on the liquid, gas, and nitrogen pipeline of the loading skid act to regulate pressure in order to protect equipment and instruments within the skid. If the pressure exceeds the design limit, these safety valves will activate and ensure the safety of the system.

 

 

System Performance Indicators

Supports simultaneous connection of multiple valves, programmable valve operation sequence, and 8-channel feedback signals.
Accepts pulse signals and 4–20mA signals from flowmeters, supporting real-time data communication.
Connects to 4–20mA output temperature sensors or PT100 platinum resistance sensors with an error margin of ±2%.
Supports powered, voltage-type, or passive level switches.
Compatible with common electrostatic grounding devices.
Loading accuracy under system control: ±0.1%.
Uses open MODBUS communication protocol, allowing easy system integration.

Top Loading Arm Skid best

 

 
 
System Composition
Top Loading Arm Skid suppliers
01.

Upper-Level Control System

Data service workstation

LED monitor

A4 dot matrix printer

UPS uninterruptible power supply

Ethernet switch

485/232 communication module

Loading monitoring software

IC card writer

02.

Field Control Instruments and Equipment

Batch loading controller
Explosion-proof control box
Mass flowmeter or Roots flowmeter (for oil products)
Digital electro-hydraulic valve or pneumatic two-stage valve
Integrated temperature transmitter
Anti-static overflow controller
Explosion-proof card reader

Top Loading Arm Skid
 
Order Process
 
01/

Inquiry---Provide us all clear requirements(total qty and package details).

02/

Quotation---Official quotation form with all clear specifications from our professional team.

03/

Making Sample - Confirm all quotation details and the final sample.

04/

Payment terms---T/T 30% deposit before production, 70% balance against copy of BOL

05/

Production---Mass production.

06/

Shipping-- By sea or by air or by railway.

 

产品类别-539-342

 

 

FAQ

 

 

Q: How can i get the price?

A: We usually quote within 24 hours after we get your inquiry(Except weekend and holidays). If you are very urgent to get the price, please email us or contact us in other ways so that we can offer you a quote.

Q: Can I buy samples placing orders?

A: Yes.Please feel free to contact us.

Q: What is your lead time?

A: It depends on the order quantity and the season you place the order. Usually we can ship within 7-15 days for small quantity,and about 30 days for large quantity.

Q: What is your payment term?

A: T/T,Western Union,Alipay,MoneyGram,and Paypal.This is negotiable.

Q: What is the shipping method?

A: It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.

We are one of the most professional loading and metering skid manufacturers and suppliers in China, featured by quality products and good service. Please rest assured to buy custom made loading and metering skid from our factory.