Marine Loading Arm QCDC
Emergency Disconnection:
In case of fire or other hazardous situations, the ERC allows the loading arm to rapidly disconnect from the vessel, minimizing risks and ensuring the safety of operators, equipment, and facilities.
01
Automatic Sealing:
Once disconnected, the ERC automatically seals both ends of the pipeline, preventing product leakage, reducing environmental pollution, and minimizing valuable cargo loss.
02
Equipment Protection:
Prevents mechanical damage to both the loading arm and the vessel caused by excessive tension or impact, thereby reducing downtime and maintenance costs.
03
Safety Braking:
During disconnection, the ERC ensures effective braking of the inner and outer arms, avoiding uncontrolled movement due to the loss of balance system support.
04
Installation Location:
The ERC is typically installed on the vertical section of the loading arm's three-dimensional swivel joint, ensuring optimal performance in emergency situations.
05




